找回密碼
 註冊
查看: 4875|回覆: 29

Zaha Hadid Design Selected for Japan National Stadium

  [複製鏈接]
簽到
3972
發表於 2012-12-6 17:16:33 | 顯示全部樓層 |閱讀模式

登入後,內容更豐富

您需要 登錄 才可以下載或查看,沒有賬號?註冊

×
Zaha Hadid Design Selected for Japan National Stadium
zaha-hadid-japan-national-stadium.jpg

The judges were also looking for a design that would integrate well with the local road system and landscape (Image © Zaha Hadid Architects)
zaha-hadid-japan-national-stadium-6.jpg


It may have been likened to a bicycle helmet, but that hasn't stopped the Japan Sport Council from selecting Zaha Hadid Architect's design for a new Japanese national stadium to be built by 2019. It's hoped that the design for the 80,000-seat stadium will boost Tokyo's chances of hosting the 2020 Summer Olympics.

The design was the winning entrant to an international competition to design a stadium to hold 80,000 people with a retractable all-weather roof: a specification only matched by Cowboys Stadium in Arlington, Texas.


It's hoped that the design for the 80,000-seat stadium will boost Tokyo's chances of hosting the 2020 Summer Olympics (Image © Zaha Hadid Architects)
zaha-hadid-japan-national-stadium-0.jpg
zaha-hadid-japan-national-stadium-4.jpg


The judges, who were chaired by architect Tadao Ando and included Norman Foster and Richard Rogers, were also looking for a design that would integrate well with the local road system and landscape.

zaha-hadid-japan-national-stadium-2.jpg
zaha-hadid-japan-national-stadium-7.jpg

Hadid beat out imposing competition: none more so than sports and stadia specialists Populous, which has a number of national arenas to its name. The new national stadium will match Populous' London's Olympic Stadium design for capacity, and that of the Beijing National Stadium (better known as the Bird's Nest), though this has been reduced from its 91,000 capacity at the time of the 2008 Olympics.

The detailed design and construction of the stadium is budgeted at ¥130 billion (US$1.6 billion), and will press ahead for completion by the 2019 Rugby World Cup. The stadium will stand on the site of the current Olympic Stadium, built for the 1964 Olympics, which will be demolished by October 2015.

zaha-hadid-japan-national-stadium-3.jpg
zaha-hadid-japan-national-stadium-5.jpg
發表於 2012-12-6 17:24:12 | 顯示全部樓層
回覆 讚好 不讚 使用道具

舉報

 樓主| 發表於 2012-12-6 17:27:23 | 顯示全部樓層

好似單車頭盔
回覆 讚好 不讚 使用道具

舉報

發表於 2012-12-6 17:30:19 | 顯示全部樓層
用16億美金起⋯
回覆 讚好 不讚 使用道具

舉報

發表於 2012-12-6 17:30:39 | 顯示全部樓層
嘩 !!!! 個設計好流線型喎
回覆 讚好 不讚 使用道具

舉報

發表於 2012-12-6 17:32:12 | 顯示全部樓層

靈感可能係嚟自單車頭盔
回覆 讚好 不讚 使用道具

舉報

 樓主| 發表於 2012-12-6 17:36:16 | 顯示全部樓層
水晶晶 發表於 2012-12-6 17:32
靈感可能係嚟自單車頭盔

我估100%都係
回覆 讚好 不讚 使用道具

舉報

發表於 2012-12-6 17:39:05 | 顯示全部樓層

呢個角度勁似

                               
登錄/註冊後可看大圖
回覆 讚好 不讚 使用道具

舉報

 樓主| 發表於 2012-12-6 17:50:57 | 顯示全部樓層
kaka1228 發表於 2012-12-6 17:30
用16億美金起⋯

估算 = 段估
回覆 讚好 不讚 使用道具

舉報

 樓主| 發表於 2012-12-6 17:51:42 | 顯示全部樓層
waiking 發表於 2012-12-6 17:30
嘩 !!!! 個設計好流線型喎

外型好吸引
回覆 讚好 不讚 使用道具

舉報

發表於 2012-12-6 17:54:16 | 顯示全部樓層

好時代感,同周邊嘅對比好強烈
回覆 讚好 不讚 使用道具

舉報

發表於 2012-12-6 17:55:49 | 顯示全部樓層

估算通常實超支添⋯
回覆 讚好 不讚 使用道具

舉報

 樓主| 發表於 2012-12-6 18:14:06 | 顯示全部樓層
waiking 發表於 2012-12-6 17:54
好時代感,同周邊嘅對比好強烈

香港就算有錢有地方都難以實現
回覆 讚好 不讚 使用道具

舉報

發表於 2012-12-6 18:14:09 | 顯示全部樓層
回復 Juven #1 的帖子

個設計幾超現實。
回覆 讚好 不讚 使用道具

舉報

 樓主| 發表於 2012-12-6 18:14:59 | 顯示全部樓層
kaka1228 發表於 2012-12-6 17:55
估算通常實超支添⋯

That's why "Estimate Only"
回覆 讚好 不讚 使用道具

舉報

發表於 2012-12-6 18:17:38 | 顯示全部樓層
Juven 發表於 2012-12-6 18:14
香港就算有錢有地方都難以實現

番港全部都係高樓大廈...
回覆 讚好 不讚 使用道具

舉報

 樓主| 發表於 2012-12-6 18:23:35 | 顯示全部樓層
waiking 發表於 2012-12-6 18:17
番港全部都係高樓大廈...

依d投資分分鐘蝕到血本無歸
回覆 讚好 不讚 使用道具

舉報

發表於 2012-12-6 18:25:05 | 顯示全部樓層
Juven 發表於 2012-12-6 18:23
依d投資分分鐘蝕到血本無歸


政府九電
回覆 讚好 不讚 使用道具

舉報

 樓主| 發表於 2012-12-6 18:50:04 | 顯示全部樓層

依家特區政府寸步難行
點攪!
回覆 讚好 不讚 使用道具

舉報

發表於 2012-12-6 18:58:39 | 顯示全部樓層
Juven 發表於 2012-12-6 18:50
依家特區政府寸步難行
點攪!

而家做鬼刀唔靈啦
回覆 讚好 不讚 使用道具

舉報

您需要登錄後才可以回帖 登錄 | 註冊

本版積分規則

Archiver|聯絡我們|141華人社區

GMT+8, 2024-4-29 00:35

Powered by Discuz! X3.5

© 2001-2024 Discuz! Team.

快速回覆 返回頂部 返回列表